Oct 5, 2015

Caltrans Maintenance Storm Water Division Bioswale trial project-Erosion control and Slope inspection.

The trial could result one of Caltrans rethinking landscaping plan.

In 6 months Kurapia covered bioswale area entirely like a solid dense carpet, which will absorb and slow down stormwater.  

Freeway 210 Azusa area

Installation and maintenance managed by
Ecotech Services, Inc.

April 23, 2015
June 16, 2015
August 5, 2015

Oct 5, 2015

Oct 5, 2015

photos are provided by EcoTech and Kurapia